Aluminized or stainless-steel options according to project requirements.
- 800.391.1775
- info@evelynscs.com
- Mon - Fri: 8:00 - 5:00 p.m
New construction, replacement, and retrofit chute systems coordinated around the building structure, intake doors, controls, discharge equipment, and long-term service access.
Chute sections, supports, intake doors, discharge components, access panels, and project coordination.
Manual, interlocked, electrical, or pneumatic door operation and project-specific discharge arrangements.
Separate recycle systems or coordinated trash-and-recycle layouts for point-of-use separation.
Multi-sorter configurations, labeled intake doors, controls, and separate containers.
Linen chute sections, intake doors, discharge arrangements, and access suited to laundry operations.
Project-specific materials, door operation, room layouts, and discharge equipment.
Aluminized or stainless-steel options according to project requirements.
Common sizes from 18 to 36 inches depending on design and loading.
Manual, electrical, pneumatic, or interlocked configurations.
Hoppers, rolling doors, compactors, sorters, or project-specific equipment.
Plans, specifications, chute type, controls, discharge, and schedule.
Openings, floor heights, shaft, access, and field conditions.
Supports, power, air, fire interfaces, and surrounding trades.
Sections, doors, supports, discharge, and approved controls.
Operating checks, adjustments, cleanup, and documentation.
Plans, floor count, chute type, diameter, door operation, discharge layout, and schedule help define the correct scope.
Yes. The proposal can include chute sections, intake doors, supports, discharge equipment, controls, and turnover.
Yes. Replacement begins with the shaft, access, discharge room, existing doors, and surrounding conditions.
Yes. Inspection, maintenance, parts, controls, door service, and discharge repairs can be quoted separately.